ASIA INFRASTRUCTURE SOLUTIONS LTD
Resident Clerical Assistant / 駐地盤文書助理 - Ref No. IWS/RCA-202506_19
10-Jun-2025
Ref:OL02039329
Full Time,Contract Unspecified

Minimum academic/professional qualification and experience required:

 

最低學歷及經驗要求:



Successful applicants will be appointed by Asia Infrastructure Solutions Limited. The salary, benefits and contract terms will make reference to the prevailing Government’s terms and conditions at the time of employment. Salary will be commensurate with qualifications and relevant working experience.

聘用條款:獲取錄的應徵者,建盛(亞洲)工程顧問有限公司會以合約形式聘請,聘用條款將按受聘時政府採用的編制而定,受聘人之薪酬按資歷及經驗而定。

 

Applicants are requested to send Confidential applications, one for each post, with full resume, starting earliest availability and contact telephone number(s) by post or delivery to reach the address given below, or email: [email protected] not later than 23  June 2025.

Please quote the Post Reference on the envelope and application for the Post you like to apply.

Asia Infrastructure Solutions Limited

23/F, Two Harbour Square, 180 Wai Yip Street, Kwun Tong, Kowloon 

Attention : Human Resources Department (RSS)

 

應徵者須將申請信連同履歷,到職日期及個人聯絡電話號碼,於二零二五年六月二十三日或之前,郵寄:[email protected] 或交達至

應徵者必須在申請信及信封上寫上申請職位編號.

建盛(亞洲)工程顧問有限公司

九龍觀塘偉業街180號 Two Harbour Square 二十三樓 

人力資源部 (RSS) 收 

 

Applicants are advised that if no response has been received within three months from 23 June 2025, their applications should be considered unsuccessful. (Personal data collected will be used for the recruitment purpose only. The companies will retain the personal data of the applicants for a maximum period of 12 months, after which their personal data will be destroyed.)

如果符合訂明入職條件的應徵者人數眾多,本公司會訂立篩選凖則,甄選條件較佳的應徵者,以便進一步處理。在此情況下,只有獲篩選的應徵者會獲邀參加聘面試。應徵者如在自二零二五年六月二十三日起三個月內未收到任何回覆,則應認為其申請不成功。(應徵者所提供之全部資料只作聘請之用,本公司將保留應徵者之個人資料最長十二個月,並會在十二個月後銷毁。)



Tags for this job:

Asia Infrastructure Solutions Limited has been appointed by the Construction Division of Water Supplies Department as the Consultant for Contract No. 6/WSD/25 - Improvement of Water Supply in Northern New Territories.

建盛(亞洲)工程顧問有限公司水務署建設部委託為工程合約編號6/WSD/25 - 新界北區食水供應改善工程的顧問。

 

The works comprise modification of Tai Po Fresh Water Pumping Station, construction of Tong Hang Fresh Water Pumping Station, and laying of about 5.2km-long fresh water trunk main in Tai Po District and North District. The works is anticipated to commence in 2025 Q3 and will take about 48 months to complete. 

該工程包括大埔食水抽水站的翻新改善工程、建設塘坑食水抽水站、以及在大埔區和北區鋪設約5.2公里長的食水幹管。工程預計將於2025年第三季度開始,預計需時約48個月完成。

 

We now invite applications for the following Resident Site Staff positions:

我們現招聘以下駐地盤工程職位:



More jobs from this company